Passenger/Material Hoist Installation and Dismantling — Inspection and Test Plan

Passenger/Material Hoist Installation and DismantlingProject Management

ACT-007 / ITP / R00

Passenger/Material Hoist Installation and Dismantling — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Release base and ties—————
Coordinate specialist erection—————
Obtain commissioning clearance—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: mast, cage, landings and interlocked gates

Inspection sequence

  • Release base and ties
  • Coordinate specialist erection
  • Obtain commissioning clearance

Inspection controls

  • Mast configuration, gate interlocks and rated load certificate
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________