Passenger/Material Hoist Installation and Dismantling — Inspection Checklist

Passenger/Material Hoist Installation and DismantlingProject Management

ACT-007 / CHK / R00

Passenger/Material Hoist Installation and Dismantling — Inspection Checklist

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection Checklist worksheet
Inspection pointAcceptance referenceObservationPass / Fail / N/AEvidenceInspector / date
Release base and ties—————
Coordinate specialist erection—————
Obtain commissioning clearance—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: mast, cage, landings and interlocked gates

Inspection points

  • Release base and ties
  • Coordinate specialist erection
  • Obtain commissioning clearance

Records and release

  • Mast configuration, gate interlocks and rated load certificate
  • Record observed condition, acceptance reference, result and evidence for each item.
  • Inspector / witness / date / corrective action and reinspection: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.