Skip to content

Risk AssessmentACT-002-RAR00Available

Setting Out and Survey Works — Risk Assessment

Setting Out and Survey WorksProject Management

ACT-002 / RA / R00

Setting Out and Survey Works — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Recover control—————
Close an independent traverse—————
Transfer grid and levels to protected marks—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: total station, level and benchmark markers

Task risk review

  • Recover control
  • Close an independent traverse
  • Transfer grid and levels to protected marks

Assessment prompts

  • Assess interfaces relevant to this location: Moving plant, temporary services and public access.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.