ACT-002 / CHK / R00
Setting Out and Survey Works — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Recover control | — | — | — | — | — |
| Close an independent traverse | — | — | — | — | — |
| Transfer grid and levels to protected marks | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: total station, level and benchmark markers
Inspection points
- Recover control
- Close an independent traverse
- Transfer grid and levels to protected marks
Records and release
- Coordinates, survey closure and instrument calibration
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________