Method statement packages

164 activities with editable method statements, risk assessments, inspection and test plans, and material and work inspection checklists.

164 activities

Preliminaries & Enabling Works

Site Mobilisation and Site Establishment
  • Method statement

    SQP-PM-MS-001 · DOCX · 474 KB

  • Risk assessment

    SQP-PM-RA-001 · DOCX · 79 KB

  • Inspection and test plan

    SQP-PM-ITP-001 · DOCX · 18 KB

  • Material inspection checklist

    SQP-PM-CHK-001 · DOCX · 16 KB

  • Work inspection checklist

    SQP-PM-CHK-002 · DOCX · 16 KB

View activity details
Setting Out and Survey Works
  • Method statement

    SQP-CIV-MS-001 · DOCX · 393 KB

  • Risk assessment

    SQP-CIV-RA-001 · DOCX · 78 KB

  • Inspection and test plan

    SQP-CIV-ITP-001 · DOCX · 17 KB

  • Material inspection checklist

    SQP-CIV-CHK-001 · DOCX · 15 KB

  • Work inspection checklist

    SQP-CIV-CHK-002 · DOCX · 15 KB

View activity details
Site Hoarding and Gates Installation
  • Method statement

    SQP-CIV-MS-001 · DOCX · 369 KB

  • Risk assessment

    SQP-CIV-RA-001 · DOCX · 77 KB

  • Inspection and test plan

    SQP-CIV-ITP-001 · DOCX · 17 KB

  • Material inspection checklist

    SQP-CIV-CHK-001 · DOCX · 14 KB

  • Work inspection checklist

    SQP-CIV-CHK-002 · DOCX · 15 KB

View activity details
Temporary Site Offices and Facilities
  • Method statement

    SQP-CIV-MS-001 · DOCX · 416 KB

  • Risk assessment

    SQP-CIV-RA-001 · DOCX · 78 KB

  • Inspection and test plan

    SQP-CIV-ITP-001 · DOCX · 17 KB

  • Material inspection checklist

    SQP-CIV-CHK-001 · DOCX · 15 KB

  • Work inspection checklist

    SQP-CIV-CHK-002 · DOCX · 16 KB

View activity details
Temporary Power and Water Supply
  • Method statement

    SQP-MEP-MS-001 · DOCX · 596 KB

  • Risk assessment

    SQP-MEP-RA-001 · DOCX · 79 KB

  • Inspection and test plan

    SQP-MEP-ITP-001 · DOCX · 18 KB

  • Material inspection checklist

    SQP-MEP-CHK-001 · DOCX · 16 KB

  • Work inspection checklist

    SQP-MEP-CHK-002 · DOCX · 16 KB

View activity details
Tower Crane Installation, Climbing and Dismantling
  • Method statement

    SQP-TW-MS-001 · DOCX · 583 KB

  • Risk assessment

    SQP-TW-RA-001 · DOCX · 82 KB

  • Inspection and test plan

    SQP-TW-ITP-001 · DOCX · 20 KB

  • Material inspection checklist

    SQP-TW-CHK-001 · DOCX · 17 KB

  • Work inspection checklist

    SQP-TW-CHK-002 · DOCX · 18 KB

View activity details
Passenger-Material Hoist Installation and Dismantling
  • Method statement

    SQP-TW-MS-001 · DOCX · 517 KB

  • Risk assessment

    SQP-TW-RA-001 · DOCX · 82 KB

  • Inspection and test plan

    SQP-TW-ITP-001 · DOCX · 20 KB

  • Material inspection checklist

    SQP-TW-CHK-001 · DOCX · 17 KB

  • Work inspection checklist

    SQP-TW-CHK-002 · DOCX · 17 KB

View activity details
Mobile Crane Lifting Operations
  • Method statement

    SQP-GEN-MS-001 · DOCX · 550 KB

  • Risk assessment

    SQP-GEN-RA-001 · DOCX · 80 KB

  • Inspection and test plan

    SQP-GEN-ITP-001 · DOCX · 18 KB

  • Material inspection checklist

    SQP-GEN-CHK-001 · DOCX · 16 KB

  • Work inspection checklist

    SQP-GEN-CHK-002 · DOCX · 16 KB

View activity details
Scaffolding Erection and Dismantling
  • Method statement

    SQP-TW-MS-001 · DOCX · 507 KB

  • Risk assessment

    SQP-TW-RA-001 · DOCX · 80 KB

  • Inspection and test plan

    SQP-TW-ITP-001 · DOCX · 18 KB

  • Material inspection checklist

    SQP-TW-CHK-001 · DOCX · 16 KB

  • Work inspection checklist

    SQP-TW-CHK-002 · DOCX · 16 KB

View activity details
Temporary Works (Propping and Back-Propping)
  • Method statement

    SQP-TW-MS-002 · DOCX · 455 KB

  • Risk assessment

    SQP-TW-RA-002 · DOCX · 79 KB

  • Inspection and test plan

    SQP-TW-ITP-002 · DOCX · 17 KB

  • Material inspection checklist

    SQP-TW-CHK-003 · DOCX · 16 KB

  • Work inspection checklist

    SQP-TW-CHK-004 · DOCX · 16 KB

View activity details
Traffic Management and Site Logistics
  • Method statement

    SQP-TW-MS-003 · DOCX · 450 KB

  • Risk assessment

    SQP-TW-RA-003 · DOCX · 78 KB

  • Inspection and test plan

    SQP-TW-ITP-003 · DOCX · 17 KB

  • Material inspection checklist

    SQP-TW-CHK-005 · DOCX · 15 KB

  • Work inspection checklist

    SQP-TW-CHK-006 · DOCX · 16 KB

View activity details
Demobilisation and Site Clearance
  • Method statement

    SQP-TW-MS-004 · DOCX · 473 KB

  • Risk assessment

    SQP-TW-RA-004 · DOCX · 79 KB

  • Inspection and test plan

    SQP-TW-ITP-004 · DOCX · 17 KB

  • Material inspection checklist

    SQP-TW-CHK-007 · DOCX · 15 KB

  • Work inspection checklist

    SQP-TW-CHK-008 · DOCX · 16 KB

View activity details

Earthworks & Foundations

Site Clearance and Grubbing
  • Method statement

    SQP-EF-MS-001 · DOCX · 413 KB

  • Risk assessment

    SQP-EF-RA-001 · DOCX · 77 KB

  • Inspection and test plan

    SQP-EF-ITP-001 · DOCX · 15 KB

  • Material inspection checklist

    SQP-EF-CHK-001 · DOCX · 14 KB

  • Work inspection checklist

    SQP-EF-CHK-002 · DOCX · 14 KB

View activity details
Excavation Works
  • Method statement

    SQP-EF-MS-002 · DOCX · 427 KB

  • Risk assessment

    SQP-EF-RA-002 · DOCX · 77 KB

  • Inspection and test plan

    SQP-EF-ITP-002 · DOCX · 15 KB

  • Material inspection checklist

    SQP-EF-CHK-003 · DOCX · 14 KB

  • Work inspection checklist

    SQP-EF-CHK-004 · DOCX · 14 KB

View activity details
Shoring Works (Sheet Piles-Secant Piles-Contiguous Piles)
  • Method statement

    SQP-EF-MS-003 · DOCX · 450 KB

  • Risk assessment

    SQP-EF-RA-003 · DOCX · 77 KB

  • Inspection and test plan

    SQP-EF-ITP-003 · DOCX · 15 KB

  • Material inspection checklist

    SQP-EF-CHK-005 · DOCX · 15 KB

  • Work inspection checklist

    SQP-EF-CHK-006 · DOCX · 15 KB

View activity details
Diaphragm Wall Construction
  • Method statement

    SQP-EF-MS-004 · DOCX · 406 KB

  • Risk assessment

    SQP-EF-RA-004 · DOCX · 77 KB

  • Inspection and test plan

    SQP-EF-ITP-004 · DOCX · 15 KB

  • Material inspection checklist

    SQP-EF-CHK-007 · DOCX · 14 KB

  • Work inspection checklist

    SQP-EF-CHK-008 · DOCX · 14 KB

View activity details
Dewatering Works
  • Method statement

    SQP-EF-MS-005 · DOCX · 439 KB

  • Risk assessment

    SQP-EF-RA-005 · DOCX · 76 KB

  • Inspection and test plan

    SQP-EF-ITP-005 · DOCX · 15 KB

  • Material inspection checklist

    SQP-EF-CHK-009 · DOCX · 14 KB

  • Work inspection checklist

    SQP-EF-CHK-010 · DOCX · 14 KB

View activity details
Bored Piling Works
  • Method statement

    SQP-EF-MS-006 · DOCX · 441 KB

  • Risk assessment

    SQP-EF-RA-006 · DOCX · 76 KB

  • Inspection and test plan

    SQP-EF-ITP-006 · DOCX · 15 KB

  • Material inspection checklist

    SQP-EF-CHK-011 · DOCX · 14 KB

  • Work inspection checklist

    SQP-EF-CHK-012 · DOCX · 14 KB

View activity details
Pile Load Testing (Static-Dynamic)
  • Method statement

    SQP-EF-MS-007 · DOCX · 372 KB

  • Risk assessment

    SQP-EF-RA-007 · DOCX · 76 KB

  • Inspection and test plan

    SQP-EF-ITP-007 · DOCX · 15 KB

  • Material inspection checklist

    SQP-EF-CHK-013 · DOCX · 14 KB

  • Work inspection checklist

    SQP-EF-CHK-014 · DOCX · 14 KB

View activity details
Pile Integrity Testing
  • Method statement

    SQP-EF-MS-008 · DOCX · 388 KB

  • Risk assessment

    SQP-EF-RA-008 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EF-ITP-008 · DOCX · 15 KB

  • Material inspection checklist

    SQP-EF-CHK-015 · DOCX · 14 KB

  • Work inspection checklist

    SQP-EF-CHK-016 · DOCX · 14 KB

View activity details
Pile Head Cutting and Trimming
  • Method statement

    SQP-EF-MS-009 · DOCX · 398 KB

  • Risk assessment

    SQP-EF-RA-009 · DOCX · 76 KB

  • Inspection and test plan

    SQP-EF-ITP-009 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EF-CHK-017 · DOCX · 14 KB

  • Work inspection checklist

    SQP-EF-CHK-018 · DOCX · 14 KB

View activity details
Blinding Concrete
  • Method statement

    SQP-EF-MS-010 · DOCX · 357 KB

  • Risk assessment

    SQP-EF-RA-010 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EF-ITP-010 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EF-CHK-019 · DOCX · 14 KB

  • Work inspection checklist

    SQP-EF-CHK-020 · DOCX · 14 KB

View activity details
Below-Grade Waterproofing (Membrane)
  • Method statement

    SQP-EF-MS-011 · DOCX · 402 KB

  • Risk assessment

    SQP-EF-RA-011 · DOCX · 76 KB

  • Inspection and test plan

    SQP-EF-ITP-011 · DOCX · 15 KB

  • Material inspection checklist

    SQP-EF-CHK-021 · DOCX · 14 KB

  • Work inspection checklist

    SQP-EF-CHK-022 · DOCX · 14 KB

View activity details
Anti-Termite Treatment
  • Method statement

    SQP-EF-MS-012 · DOCX · 392 KB

  • Risk assessment

    SQP-EF-RA-012 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EF-ITP-012 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EF-CHK-023 · DOCX · 14 KB

  • Work inspection checklist

    SQP-EF-CHK-024 · DOCX · 14 KB

View activity details
Raft Foundation Construction
  • Method statement

    SQP-EF-MS-013 · DOCX · 386 KB

  • Risk assessment

    SQP-EF-RA-013 · DOCX · 76 KB

  • Inspection and test plan

    SQP-EF-ITP-013 · DOCX · 15 KB

  • Material inspection checklist

    SQP-EF-CHK-025 · DOCX · 14 KB

  • Work inspection checklist

    SQP-EF-CHK-026 · DOCX · 14 KB

View activity details
Pile Caps and Grade Beams
  • Method statement

    SQP-EF-MS-014 · DOCX · 356 KB

  • Risk assessment

    SQP-EF-RA-014 · DOCX · 76 KB

  • Inspection and test plan

    SQP-EF-ITP-014 · DOCX · 15 KB

  • Material inspection checklist

    SQP-EF-CHK-027 · DOCX · 14 KB

  • Work inspection checklist

    SQP-EF-CHK-028 · DOCX · 14 KB

View activity details
Backfilling and Compaction
  • Method statement

    SQP-EF-MS-015 · DOCX · 366 KB

  • Risk assessment

    SQP-EF-RA-015 · DOCX · 76 KB

  • Inspection and test plan

    SQP-EF-ITP-015 · DOCX · 15 KB

  • Material inspection checklist

    SQP-EF-CHK-029 · DOCX · 14 KB

  • Work inspection checklist

    SQP-EF-CHK-030 · DOCX · 14 KB

View activity details
Soil Compaction Testing (Field Density Test)
  • Method statement

    SQP-EF-MS-016 · DOCX · 416 KB

  • Risk assessment

    SQP-EF-RA-016 · DOCX · 76 KB

  • Inspection and test plan

    SQP-EF-ITP-016 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EF-CHK-031 · DOCX · 14 KB

  • Work inspection checklist

    SQP-EF-CHK-032 · DOCX · 14 KB

View activity details

Concrete Structure

Formwork for Columns and Walls
  • Method statement

    SQP-CS-MS-001 · DOCX · 373 KB

  • Risk assessment

    SQP-CS-RA-001 · DOCX · 76 KB

  • Inspection and test plan

    SQP-CS-ITP-001 · DOCX · 14 KB

  • Material inspection checklist

    SQP-CS-CHK-001 · DOCX · 14 KB

  • Work inspection checklist

    SQP-CS-CHK-002 · DOCX · 14 KB

View activity details
Formwork for Slabs and Beams
  • Method statement

    SQP-CS-MS-002 · DOCX · 341 KB

  • Risk assessment

    SQP-CS-RA-002 · DOCX · 76 KB

  • Inspection and test plan

    SQP-CS-ITP-002 · DOCX · 14 KB

  • Material inspection checklist

    SQP-CS-CHK-003 · DOCX · 13 KB

  • Work inspection checklist

    SQP-CS-CHK-004 · DOCX · 14 KB

View activity details
Core Wall Jump Form-Climbing Form System
  • Method statement

    SQP-CS-MS-003 · DOCX · 335 KB

  • Risk assessment

    SQP-CS-RA-003 · DOCX · 75 KB

  • Inspection and test plan

    SQP-CS-ITP-003 · DOCX · 14 KB

  • Material inspection checklist

    SQP-CS-CHK-005 · DOCX · 13 KB

  • Work inspection checklist

    SQP-CS-CHK-006 · DOCX · 14 KB

View activity details
Table Form-Flying Form System
  • Method statement

    SQP-CS-MS-004 · DOCX · 307 KB

  • Risk assessment

    SQP-CS-RA-004 · DOCX · 75 KB

  • Inspection and test plan

    SQP-CS-ITP-004 · DOCX · 14 KB

  • Material inspection checklist

    SQP-CS-CHK-007 · DOCX · 13 KB

  • Work inspection checklist

    SQP-CS-CHK-008 · DOCX · 14 KB

View activity details
Reinforcement Steel Fixing
  • Method statement

    SQP-CS-MS-005 · DOCX · 333 KB

  • Risk assessment

    SQP-CS-RA-005 · DOCX · 75 KB

  • Inspection and test plan

    SQP-CS-ITP-005 · DOCX · 14 KB

  • Material inspection checklist

    SQP-CS-CHK-009 · DOCX · 13 KB

  • Work inspection checklist

    SQP-CS-CHK-010 · DOCX · 14 KB

View activity details
Mechanical Couplers (Rebar Splicing)
  • Method statement

    SQP-CS-MS-006 · DOCX · 293 KB

  • Risk assessment

    SQP-CS-RA-006 · DOCX · 75 KB

  • Inspection and test plan

    SQP-CS-ITP-006 · DOCX · 14 KB

  • Material inspection checklist

    SQP-CS-CHK-011 · DOCX · 13 KB

  • Work inspection checklist

    SQP-CS-CHK-012 · DOCX · 13 KB

View activity details
Concrete Pouring (General)
  • Method statement

    SQP-CS-MS-007 · DOCX · 353 KB

  • Risk assessment

    SQP-CS-RA-007 · DOCX · 75 KB

  • Inspection and test plan

    SQP-CS-ITP-007 · DOCX · 14 KB

  • Material inspection checklist

    SQP-CS-CHK-013 · DOCX · 13 KB

  • Work inspection checklist

    SQP-CS-CHK-014 · DOCX · 13 KB

View activity details
Mass Concrete Pouring (Raft)
  • Method statement

    SQP-CS-MS-008 · DOCX · 332 KB

  • Risk assessment

    SQP-CS-RA-008 · DOCX · 75 KB

  • Inspection and test plan

    SQP-CS-ITP-008 · DOCX · 14 KB

  • Material inspection checklist

    SQP-CS-CHK-015 · DOCX · 13 KB

  • Work inspection checklist

    SQP-CS-CHK-016 · DOCX · 13 KB

View activity details
Concrete Pumping Works
  • Method statement

    SQP-CS-MS-009 · DOCX · 342 KB

  • Risk assessment

    SQP-CS-RA-009 · DOCX · 75 KB

  • Inspection and test plan

    SQP-CS-ITP-009 · DOCX · 14 KB

  • Material inspection checklist

    SQP-CS-CHK-017 · DOCX · 13 KB

  • Work inspection checklist

    SQP-CS-CHK-018 · DOCX · 13 KB

View activity details
Hot Weather Concreting
  • Method statement

    SQP-CS-MS-010 · DOCX · 337 KB

  • Risk assessment

    SQP-CS-RA-010 · DOCX · 75 KB

  • Inspection and test plan

    SQP-CS-ITP-010 · DOCX · 14 KB

  • Material inspection checklist

    SQP-CS-CHK-019 · DOCX · 13 KB

  • Work inspection checklist

    SQP-CS-CHK-020 · DOCX · 13 KB

View activity details
Concrete Curing
  • Method statement

    SQP-CS-MS-011 · DOCX · 341 KB

  • Risk assessment

    SQP-CS-RA-011 · DOCX · 75 KB

  • Inspection and test plan

    SQP-CS-ITP-011 · DOCX · 14 KB

  • Material inspection checklist

    SQP-CS-CHK-021 · DOCX · 13 KB

  • Work inspection checklist

    SQP-CS-CHK-022 · DOCX · 13 KB

View activity details
Construction Joints and Waterstops
  • Method statement

    SQP-CS-MS-012 · DOCX · 363 KB

  • Risk assessment

    SQP-CS-RA-012 · DOCX · 75 KB

  • Inspection and test plan

    SQP-CS-ITP-012 · DOCX · 14 KB

  • Material inspection checklist

    SQP-CS-CHK-023 · DOCX · 13 KB

  • Work inspection checklist

    SQP-CS-CHK-024 · DOCX · 13 KB

View activity details
Post-Tensioned Slabs
  • Method statement

    SQP-CS-MS-013 · DOCX · 348 KB

  • Risk assessment

    SQP-CS-RA-013 · DOCX · 75 KB

  • Inspection and test plan

    SQP-CS-ITP-013 · DOCX · 14 KB

  • Material inspection checklist

    SQP-CS-CHK-025 · DOCX · 13 KB

  • Work inspection checklist

    SQP-CS-CHK-026 · DOCX · 14 KB

View activity details
Precast Concrete Elements Installation
  • Method statement

    SQP-CS-MS-014 · DOCX · 347 KB

  • Risk assessment

    SQP-CS-RA-014 · DOCX · 75 KB

  • Inspection and test plan

    SQP-CS-ITP-014 · DOCX · 14 KB

  • Material inspection checklist

    SQP-CS-CHK-027 · DOCX · 13 KB

  • Work inspection checklist

    SQP-CS-CHK-028 · DOCX · 13 KB

View activity details
Hollow Core Slab Installation
  • Method statement

    SQP-CS-MS-015 · DOCX · 302 KB

  • Risk assessment

    SQP-CS-RA-015 · DOCX · 75 KB

  • Inspection and test plan

    SQP-CS-ITP-015 · DOCX · 14 KB

  • Material inspection checklist

    SQP-CS-CHK-029 · DOCX · 13 KB

  • Work inspection checklist

    SQP-CS-CHK-030 · DOCX · 13 KB

View activity details
Concrete Repair Works
  • Method statement

    SQP-CS-MS-016 · DOCX · 363 KB

  • Risk assessment

    SQP-CS-RA-016 · DOCX · 75 KB

  • Inspection and test plan

    SQP-CS-ITP-016 · DOCX · 14 KB

  • Material inspection checklist

    SQP-CS-CHK-031 · DOCX · 13 KB

  • Work inspection checklist

    SQP-CS-CHK-032 · DOCX · 13 KB

View activity details
Core Drilling and Coring Tests
  • Method statement

    SQP-CS-MS-017 · DOCX · 353 KB

  • Risk assessment

    SQP-CS-RA-017 · DOCX · 75 KB

  • Inspection and test plan

    SQP-CS-ITP-017 · DOCX · 14 KB

  • Material inspection checklist

    SQP-CS-CHK-033 · DOCX · 13 KB

  • Work inspection checklist

    SQP-CS-CHK-034 · DOCX · 13 KB

View activity details
Embedded Items and Sleeves Installation
  • Method statement

    SQP-CS-MS-018 · DOCX · 301 KB

  • Risk assessment

    SQP-CS-RA-018 · DOCX · 75 KB

  • Inspection and test plan

    SQP-CS-ITP-018 · DOCX · 14 KB

  • Material inspection checklist

    SQP-CS-CHK-035 · DOCX · 13 KB

  • Work inspection checklist

    SQP-CS-CHK-036 · DOCX · 13 KB

View activity details
Staircase Construction
  • Method statement

    SQP-CS-MS-019 · DOCX · 312 KB

  • Risk assessment

    SQP-CS-RA-019 · DOCX · 75 KB

  • Inspection and test plan

    SQP-CS-ITP-019 · DOCX · 14 KB

  • Material inspection checklist

    SQP-CS-CHK-037 · DOCX · 13 KB

  • Work inspection checklist

    SQP-CS-CHK-038 · DOCX · 13 KB

View activity details
Shear Walls and Lift Cores
  • Method statement

    SQP-CS-MS-020 · DOCX · 334 KB

  • Risk assessment

    SQP-CS-RA-020 · DOCX · 75 KB

  • Inspection and test plan

    SQP-CS-ITP-020 · DOCX · 14 KB

  • Material inspection checklist

    SQP-CS-CHK-039 · DOCX · 13 KB

  • Work inspection checklist

    SQP-CS-CHK-040 · DOCX · 13 KB

View activity details
Water Tanks (Concrete) Construction
  • Method statement

    SQP-CS-MS-021 · DOCX · 339 KB

  • Risk assessment

    SQP-CS-RA-021 · DOCX · 75 KB

  • Inspection and test plan

    SQP-CS-ITP-021 · DOCX · 14 KB

  • Material inspection checklist

    SQP-CS-CHK-041 · DOCX · 13 KB

  • Work inspection checklist

    SQP-CS-CHK-042 · DOCX · 14 KB

View activity details
Formwork Striking and Removal
  • Method statement

    SQP-CS-MS-022 · DOCX · 330 KB

  • Risk assessment

    SQP-CS-RA-022 · DOCX · 75 KB

  • Inspection and test plan

    SQP-CS-ITP-022 · DOCX · 14 KB

  • Material inspection checklist

    SQP-CS-CHK-043 · DOCX · 13 KB

  • Work inspection checklist

    SQP-CS-CHK-044 · DOCX · 13 KB

View activity details

Structural Steel & Roof

Structural Steel Erection
  • Method statement

    SQP-SR-MS-001 · DOCX · 344 KB

  • Risk assessment

    SQP-SR-RA-001 · DOCX · 75 KB

  • Inspection and test plan

    SQP-SR-ITP-001 · DOCX · 14 KB

  • Material inspection checklist

    SQP-SR-CHK-001 · DOCX · 13 KB

  • Work inspection checklist

    SQP-SR-CHK-002 · DOCX · 13 KB

View activity details
High-Strength Bolting Works
  • Method statement

    SQP-SR-MS-002 · DOCX · 297 KB

  • Risk assessment

    SQP-SR-RA-002 · DOCX · 75 KB

  • Inspection and test plan

    SQP-SR-ITP-002 · DOCX · 14 KB

  • Material inspection checklist

    SQP-SR-CHK-003 · DOCX · 13 KB

  • Work inspection checklist

    SQP-SR-CHK-004 · DOCX · 13 KB

View activity details
Site Welding Works
  • Method statement

    SQP-SR-MS-003 · DOCX · 308 KB

  • Risk assessment

    SQP-SR-RA-003 · DOCX · 75 KB

  • Inspection and test plan

    SQP-SR-ITP-003 · DOCX · 14 KB

  • Material inspection checklist

    SQP-SR-CHK-005 · DOCX · 13 KB

  • Work inspection checklist

    SQP-SR-CHK-006 · DOCX · 13 KB

View activity details
Metal Deck Installation
  • Method statement

    SQP-SR-MS-004 · DOCX · 323 KB

  • Risk assessment

    SQP-SR-RA-004 · DOCX · 75 KB

  • Inspection and test plan

    SQP-SR-ITP-004 · DOCX · 14 KB

  • Material inspection checklist

    SQP-SR-CHK-007 · DOCX · 13 KB

  • Work inspection checklist

    SQP-SR-CHK-008 · DOCX · 13 KB

View activity details
Fire-Proofing Paint (Intumescent) for Steel
  • Method statement

    SQP-SR-MS-005 · DOCX · 300 KB

  • Risk assessment

    SQP-SR-RA-005 · DOCX · 75 KB

  • Inspection and test plan

    SQP-SR-ITP-005 · DOCX · 14 KB

  • Material inspection checklist

    SQP-SR-CHK-009 · DOCX · 13 KB

  • Work inspection checklist

    SQP-SR-CHK-010 · DOCX · 13 KB

View activity details
Roof Waterproofing and Insulation
  • Method statement

    SQP-SR-MS-006 · DOCX · 329 KB

  • Risk assessment

    SQP-SR-RA-006 · DOCX · 75 KB

  • Inspection and test plan

    SQP-SR-ITP-006 · DOCX · 14 KB

  • Material inspection checklist

    SQP-SR-CHK-011 · DOCX · 13 KB

  • Work inspection checklist

    SQP-SR-CHK-012 · DOCX · 13 KB

View activity details
Green Roof-Roof Finishes
  • Method statement

    SQP-SR-MS-007 · DOCX · 323 KB

  • Risk assessment

    SQP-SR-RA-007 · DOCX · 75 KB

  • Inspection and test plan

    SQP-SR-ITP-007 · DOCX · 14 KB

  • Material inspection checklist

    SQP-SR-CHK-013 · DOCX · 13 KB

  • Work inspection checklist

    SQP-SR-CHK-014 · DOCX · 13 KB

View activity details

Masonry & Architectural Finishes

Blockwork (Hollow-Solid-AAC)
  • Method statement

    SQP-AF-MS-001 · DOCX · 303 KB

  • Risk assessment

    SQP-AF-RA-001 · DOCX · 75 KB

  • Inspection and test plan

    SQP-AF-ITP-001 · DOCX · 14 KB

  • Material inspection checklist

    SQP-AF-CHK-001 · DOCX · 13 KB

  • Work inspection checklist

    SQP-AF-CHK-002 · DOCX · 13 KB

View activity details
Internal Plastering
  • Method statement

    SQP-AF-MS-002 · DOCX · 287 KB

  • Risk assessment

    SQP-AF-RA-002 · DOCX · 75 KB

  • Inspection and test plan

    SQP-AF-ITP-002 · DOCX · 14 KB

  • Material inspection checklist

    SQP-AF-CHK-003 · DOCX · 13 KB

  • Work inspection checklist

    SQP-AF-CHK-004 · DOCX · 13 KB

View activity details
External Plastering-Rendering
  • Method statement

    SQP-AF-MS-003 · DOCX · 292 KB

  • Risk assessment

    SQP-AF-RA-003 · DOCX · 75 KB

  • Inspection and test plan

    SQP-AF-ITP-003 · DOCX · 14 KB

  • Material inspection checklist

    SQP-AF-CHK-005 · DOCX · 13 KB

  • Work inspection checklist

    SQP-AF-CHK-006 · DOCX · 13 KB

View activity details
Floor Screeding
  • Method statement

    SQP-AF-MS-004 · DOCX · 292 KB

  • Risk assessment

    SQP-AF-RA-004 · DOCX · 75 KB

  • Inspection and test plan

    SQP-AF-ITP-004 · DOCX · 14 KB

  • Material inspection checklist

    SQP-AF-CHK-007 · DOCX · 13 KB

  • Work inspection checklist

    SQP-AF-CHK-008 · DOCX · 13 KB

View activity details
Floor Tiling (Ceramic-Porcelain)
  • Method statement

    SQP-AF-MS-005 · DOCX · 277 KB

  • Risk assessment

    SQP-AF-RA-005 · DOCX · 75 KB

  • Inspection and test plan

    SQP-AF-ITP-005 · DOCX · 14 KB

  • Material inspection checklist

    SQP-AF-CHK-009 · DOCX · 13 KB

  • Work inspection checklist

    SQP-AF-CHK-010 · DOCX · 13 KB

View activity details
Wall Tiling
  • Method statement

    SQP-AF-MS-006 · DOCX · 266 KB

  • Risk assessment

    SQP-AF-RA-006 · DOCX · 75 KB

  • Inspection and test plan

    SQP-AF-ITP-006 · DOCX · 14 KB

  • Material inspection checklist

    SQP-AF-CHK-011 · DOCX · 13 KB

  • Work inspection checklist

    SQP-AF-CHK-012 · DOCX · 13 KB

View activity details
Marble and Granite Installation
  • Method statement

    SQP-AF-MS-007 · DOCX · 297 KB

  • Risk assessment

    SQP-AF-RA-007 · DOCX · 75 KB

  • Inspection and test plan

    SQP-AF-ITP-007 · DOCX · 14 KB

  • Material inspection checklist

    SQP-AF-CHK-013 · DOCX · 13 KB

  • Work inspection checklist

    SQP-AF-CHK-014 · DOCX · 13 KB

View activity details
Wet Area Waterproofing
  • Method statement

    SQP-AF-MS-008 · DOCX · 296 KB

  • Risk assessment

    SQP-AF-RA-008 · DOCX · 75 KB

  • Inspection and test plan

    SQP-AF-ITP-008 · DOCX · 14 KB

  • Material inspection checklist

    SQP-AF-CHK-015 · DOCX · 13 KB

  • Work inspection checklist

    SQP-AF-CHK-016 · DOCX · 13 KB

View activity details
Gypsum Board Partitions
  • Method statement

    SQP-AF-MS-009 · DOCX · 286 KB

  • Risk assessment

    SQP-AF-RA-009 · DOCX · 75 KB

  • Inspection and test plan

    SQP-AF-ITP-009 · DOCX · 14 KB

  • Material inspection checklist

    SQP-AF-CHK-017 · DOCX · 13 KB

  • Work inspection checklist

    SQP-AF-CHK-018 · DOCX · 13 KB

View activity details
Gypsum Board-Mineral Fibre False Ceiling
  • Method statement

    SQP-AF-MS-010 · DOCX · 286 KB

  • Risk assessment

    SQP-AF-RA-010 · DOCX · 75 KB

  • Inspection and test plan

    SQP-AF-ITP-010 · DOCX · 14 KB

  • Material inspection checklist

    SQP-AF-CHK-019 · DOCX · 13 KB

  • Work inspection checklist

    SQP-AF-CHK-020 · DOCX · 13 KB

View activity details
Internal Painting
  • Method statement

    SQP-AF-MS-011 · DOCX · 276 KB

  • Risk assessment

    SQP-AF-RA-011 · DOCX · 75 KB

  • Inspection and test plan

    SQP-AF-ITP-011 · DOCX · 14 KB

  • Material inspection checklist

    SQP-AF-CHK-021 · DOCX · 13 KB

  • Work inspection checklist

    SQP-AF-CHK-022 · DOCX · 13 KB

View activity details
External Painting
  • Method statement

    SQP-AF-MS-012 · DOCX · 280 KB

  • Risk assessment

    SQP-AF-RA-012 · DOCX · 75 KB

  • Inspection and test plan

    SQP-AF-ITP-012 · DOCX · 14 KB

  • Material inspection checklist

    SQP-AF-CHK-023 · DOCX · 13 KB

  • Work inspection checklist

    SQP-AF-CHK-024 · DOCX · 13 KB

View activity details
Epoxy Flooring
  • Method statement

    SQP-AF-MS-013 · DOCX · 296 KB

  • Risk assessment

    SQP-AF-RA-013 · DOCX · 75 KB

  • Inspection and test plan

    SQP-AF-ITP-013 · DOCX · 14 KB

  • Material inspection checklist

    SQP-AF-CHK-025 · DOCX · 13 KB

  • Work inspection checklist

    SQP-AF-CHK-026 · DOCX · 13 KB

View activity details
Raised Access Flooring
  • Method statement

    SQP-AF-MS-014 · DOCX · 288 KB

  • Risk assessment

    SQP-AF-RA-014 · DOCX · 75 KB

  • Inspection and test plan

    SQP-AF-ITP-014 · DOCX · 14 KB

  • Material inspection checklist

    SQP-AF-CHK-027 · DOCX · 13 KB

  • Work inspection checklist

    SQP-AF-CHK-028 · DOCX · 13 KB

View activity details
Carpet and Vinyl Flooring
  • Method statement

    SQP-AF-MS-015 · DOCX · 302 KB

  • Risk assessment

    SQP-AF-RA-015 · DOCX · 75 KB

  • Inspection and test plan

    SQP-AF-ITP-015 · DOCX · 14 KB

  • Material inspection checklist

    SQP-AF-CHK-029 · DOCX · 13 KB

  • Work inspection checklist

    SQP-AF-CHK-030 · DOCX · 13 KB

View activity details
Timber Doors Installation
  • Method statement

    SQP-AF-MS-016 · DOCX · 293 KB

  • Risk assessment

    SQP-AF-RA-016 · DOCX · 75 KB

  • Inspection and test plan

    SQP-AF-ITP-016 · DOCX · 14 KB

  • Material inspection checklist

    SQP-AF-CHK-031 · DOCX · 13 KB

  • Work inspection checklist

    SQP-AF-CHK-032 · DOCX · 13 KB

View activity details
Steel-Fire-Rated Doors Installation
  • Method statement

    SQP-AF-MS-017 · DOCX · 311 KB

  • Risk assessment

    SQP-AF-RA-017 · DOCX · 75 KB

  • Inspection and test plan

    SQP-AF-ITP-017 · DOCX · 14 KB

  • Material inspection checklist

    SQP-AF-CHK-033 · DOCX · 13 KB

  • Work inspection checklist

    SQP-AF-CHK-034 · DOCX · 13 KB

View activity details
Ironmongery Installation
  • Method statement

    SQP-AF-MS-018 · DOCX · 293 KB

  • Risk assessment

    SQP-AF-RA-018 · DOCX · 75 KB

  • Inspection and test plan

    SQP-AF-ITP-018 · DOCX · 14 KB

  • Material inspection checklist

    SQP-AF-CHK-035 · DOCX · 13 KB

  • Work inspection checklist

    SQP-AF-CHK-036 · DOCX · 13 KB

View activity details
Joinery and Fixed Furniture
  • Method statement

    SQP-AF-MS-019 · DOCX · 289 KB

  • Risk assessment

    SQP-AF-RA-019 · DOCX · 75 KB

  • Inspection and test plan

    SQP-AF-ITP-019 · DOCX · 14 KB

  • Material inspection checklist

    SQP-AF-CHK-037 · DOCX · 13 KB

  • Work inspection checklist

    SQP-AF-CHK-038 · DOCX · 13 KB

View activity details
Kitchen Cabinets Installation
  • Method statement

    SQP-AF-MS-020 · DOCX · 284 KB

  • Risk assessment

    SQP-AF-RA-020 · DOCX · 75 KB

  • Inspection and test plan

    SQP-AF-ITP-020 · DOCX · 14 KB

  • Material inspection checklist

    SQP-AF-CHK-039 · DOCX · 13 KB

  • Work inspection checklist

    SQP-AF-CHK-040 · DOCX · 13 KB

View activity details
Sanitary Ware Installation
  • Method statement

    SQP-AF-MS-021 · DOCX · 289 KB

  • Risk assessment

    SQP-AF-RA-021 · DOCX · 75 KB

  • Inspection and test plan

    SQP-AF-ITP-021 · DOCX · 14 KB

  • Material inspection checklist

    SQP-AF-CHK-041 · DOCX · 13 KB

  • Work inspection checklist

    SQP-AF-CHK-042 · DOCX · 13 KB

View activity details
Handrails and Balustrades
  • Method statement

    SQP-AF-MS-022 · DOCX · 288 KB

  • Risk assessment

    SQP-AF-RA-022 · DOCX · 75 KB

  • Inspection and test plan

    SQP-AF-ITP-022 · DOCX · 14 KB

  • Material inspection checklist

    SQP-AF-CHK-043 · DOCX · 13 KB

  • Work inspection checklist

    SQP-AF-CHK-044 · DOCX · 13 KB

View activity details
Expansion Joints and Fire-Stopping
  • Method statement

    SQP-AF-MS-023 · DOCX · 299 KB

  • Risk assessment

    SQP-AF-RA-023 · DOCX · 75 KB

  • Inspection and test plan

    SQP-AF-ITP-023 · DOCX · 14 KB

  • Material inspection checklist

    SQP-AF-CHK-045 · DOCX · 13 KB

  • Work inspection checklist

    SQP-AF-CHK-046 · DOCX · 13 KB

View activity details
Signage and Wayfinding
  • Method statement

    SQP-AF-MS-024 · DOCX · 288 KB

  • Risk assessment

    SQP-AF-RA-024 · DOCX · 75 KB

  • Inspection and test plan

    SQP-AF-ITP-024 · DOCX · 14 KB

  • Material inspection checklist

    SQP-AF-CHK-047 · DOCX · 13 KB

  • Work inspection checklist

    SQP-AF-CHK-048 · DOCX · 13 KB

View activity details

Façade & Building Envelope

Curtain Wall System Installation
  • Method statement

    SQP-FB-MS-001 · DOCX · 342 KB

  • Risk assessment

    SQP-FB-RA-001 · DOCX · 76 KB

  • Inspection and test plan

    SQP-FB-ITP-001 · DOCX · 14 KB

  • Material inspection checklist

    SQP-FB-CHK-001 · DOCX · 13 KB

  • Work inspection checklist

    SQP-FB-CHK-002 · DOCX · 14 KB

View activity details
Unitised Curtain Wall Installation
  • Method statement

    SQP-FB-MS-002 · DOCX · 342 KB

  • Risk assessment

    SQP-FB-RA-002 · DOCX · 75 KB

  • Inspection and test plan

    SQP-FB-ITP-002 · DOCX · 14 KB

  • Material inspection checklist

    SQP-FB-CHK-003 · DOCX · 13 KB

  • Work inspection checklist

    SQP-FB-CHK-004 · DOCX · 14 KB

View activity details
Aluminium Windows and Doors
  • Method statement

    SQP-FB-MS-003 · DOCX · 320 KB

  • Risk assessment

    SQP-FB-RA-003 · DOCX · 76 KB

  • Inspection and test plan

    SQP-FB-ITP-003 · DOCX · 14 KB

  • Material inspection checklist

    SQP-FB-CHK-005 · DOCX · 13 KB

  • Work inspection checklist

    SQP-FB-CHK-006 · DOCX · 14 KB

View activity details
Glazing Works
  • Method statement

    SQP-FB-MS-004 · DOCX · 324 KB

  • Risk assessment

    SQP-FB-RA-004 · DOCX · 75 KB

  • Inspection and test plan

    SQP-FB-ITP-004 · DOCX · 14 KB

  • Material inspection checklist

    SQP-FB-CHK-007 · DOCX · 13 KB

  • Work inspection checklist

    SQP-FB-CHK-008 · DOCX · 14 KB

View activity details
Aluminium Composite Panel (ACP) Cladding
  • Method statement

    SQP-FB-MS-005 · DOCX · 340 KB

  • Risk assessment

    SQP-FB-RA-005 · DOCX · 76 KB

  • Inspection and test plan

    SQP-FB-ITP-005 · DOCX · 14 KB

  • Material inspection checklist

    SQP-FB-CHK-009 · DOCX · 13 KB

  • Work inspection checklist

    SQP-FB-CHK-010 · DOCX · 14 KB

View activity details
Stone Cladding (Dry Fix)
  • Method statement

    SQP-FB-MS-006 · DOCX · 334 KB

  • Risk assessment

    SQP-FB-RA-006 · DOCX · 76 KB

  • Inspection and test plan

    SQP-FB-ITP-006 · DOCX · 14 KB

  • Material inspection checklist

    SQP-FB-CHK-011 · DOCX · 13 KB

  • Work inspection checklist

    SQP-FB-CHK-012 · DOCX · 14 KB

View activity details
GRC / GRP Panels Installation
  • Method statement

    SQP-FB-MS-007 · DOCX · 338 KB

  • Risk assessment

    SQP-FB-RA-007 · DOCX · 76 KB

  • Inspection and test plan

    SQP-FB-ITP-007 · DOCX · 14 KB

  • Material inspection checklist

    SQP-FB-CHK-013 · DOCX · 13 KB

  • Work inspection checklist

    SQP-FB-CHK-014 · DOCX · 13 KB

View activity details
External Wall Insulation
  • Method statement

    SQP-FB-MS-008 · DOCX · 322 KB

  • Risk assessment

    SQP-FB-RA-008 · DOCX · 76 KB

  • Inspection and test plan

    SQP-FB-ITP-008 · DOCX · 14 KB

  • Material inspection checklist

    SQP-FB-CHK-015 · DOCX · 13 KB

  • Work inspection checklist

    SQP-FB-CHK-016 · DOCX · 14 KB

View activity details
Façade Sealants and Water Testing
  • Method statement

    SQP-FB-MS-009 · DOCX · 336 KB

  • Risk assessment

    SQP-FB-RA-009 · DOCX · 75 KB

  • Inspection and test plan

    SQP-FB-ITP-009 · DOCX · 14 KB

  • Material inspection checklist

    SQP-FB-CHK-017 · DOCX · 13 KB

  • Work inspection checklist

    SQP-FB-CHK-018 · DOCX · 14 KB

View activity details
Building Maintenance Unit (BMU) Installation
  • Method statement

    SQP-FB-MS-010 · DOCX · 331 KB

  • Risk assessment

    SQP-FB-RA-010 · DOCX · 76 KB

  • Inspection and test plan

    SQP-FB-ITP-010 · DOCX · 14 KB

  • Material inspection checklist

    SQP-FB-CHK-019 · DOCX · 13 KB

  • Work inspection checklist

    SQP-FB-CHK-020 · DOCX · 14 KB

View activity details

HVAC (Mechanical)

Ductwork Fabrication and Installation
  • Method statement

    SQP-HV-MS-001 · DOCX · 342 KB

  • Risk assessment

    SQP-HV-RA-001 · DOCX · 75 KB

  • Inspection and test plan

    SQP-HV-ITP-001 · DOCX · 14 KB

  • Material inspection checklist

    SQP-HV-CHK-001 · DOCX · 13 KB

  • Work inspection checklist

    SQP-HV-CHK-002 · DOCX · 14 KB

View activity details
Duct Insulation
  • Method statement

    SQP-HV-MS-002 · DOCX · 323 KB

  • Risk assessment

    SQP-HV-RA-002 · DOCX · 75 KB

  • Inspection and test plan

    SQP-HV-ITP-002 · DOCX · 14 KB

  • Material inspection checklist

    SQP-HV-CHK-003 · DOCX · 13 KB

  • Work inspection checklist

    SQP-HV-CHK-004 · DOCX · 14 KB

View activity details
Duct Leakage Testing
  • Method statement

    SQP-HV-MS-003 · DOCX · 321 KB

  • Risk assessment

    SQP-HV-RA-003 · DOCX · 75 KB

  • Inspection and test plan

    SQP-HV-ITP-003 · DOCX · 14 KB

  • Material inspection checklist

    SQP-HV-CHK-005 · DOCX · 13 KB

  • Work inspection checklist

    SQP-HV-CHK-006 · DOCX · 14 KB

View activity details
Chilled Water Piping Installation
  • Method statement

    SQP-HV-MS-004 · DOCX · 374 KB

  • Risk assessment

    SQP-HV-RA-004 · DOCX · 75 KB

  • Inspection and test plan

    SQP-HV-ITP-004 · DOCX · 14 KB

  • Material inspection checklist

    SQP-HV-CHK-007 · DOCX · 13 KB

  • Work inspection checklist

    SQP-HV-CHK-008 · DOCX · 14 KB

View activity details
Chilled Water Pipe Insulation
  • Method statement

    SQP-HV-MS-005 · DOCX · 398 KB

  • Risk assessment

    SQP-HV-RA-005 · DOCX · 75 KB

  • Inspection and test plan

    SQP-HV-ITP-005 · DOCX · 14 KB

  • Material inspection checklist

    SQP-HV-CHK-009 · DOCX · 13 KB

  • Work inspection checklist

    SQP-HV-CHK-010 · DOCX · 14 KB

View activity details
Hydrostatic Pressure Testing of Piping
  • Method statement

    SQP-HV-MS-006 · DOCX · 316 KB

  • Risk assessment

    SQP-HV-RA-006 · DOCX · 76 KB

  • Inspection and test plan

    SQP-HV-ITP-006 · DOCX · 14 KB

  • Material inspection checklist

    SQP-HV-CHK-011 · DOCX · 13 KB

  • Work inspection checklist

    SQP-HV-CHK-012 · DOCX · 14 KB

View activity details
Chillers Installation
  • Method statement

    SQP-HV-MS-007 · DOCX · 356 KB

  • Risk assessment

    SQP-HV-RA-007 · DOCX · 75 KB

  • Inspection and test plan

    SQP-HV-ITP-007 · DOCX · 14 KB

  • Material inspection checklist

    SQP-HV-CHK-013 · DOCX · 13 KB

  • Work inspection checklist

    SQP-HV-CHK-014 · DOCX · 14 KB

View activity details
Cooling Towers Installation
  • Method statement

    SQP-HV-MS-008 · DOCX · 337 KB

  • Risk assessment

    SQP-HV-RA-008 · DOCX · 76 KB

  • Inspection and test plan

    SQP-HV-ITP-008 · DOCX · 14 KB

  • Material inspection checklist

    SQP-HV-CHK-015 · DOCX · 13 KB

  • Work inspection checklist

    SQP-HV-CHK-016 · DOCX · 14 KB

View activity details
AHU / FAHU Installation
  • Method statement

    SQP-HV-MS-009 · DOCX · 364 KB

  • Risk assessment

    SQP-HV-RA-009 · DOCX · 75 KB

  • Inspection and test plan

    SQP-HV-ITP-009 · DOCX · 14 KB

  • Material inspection checklist

    SQP-HV-CHK-017 · DOCX · 13 KB

  • Work inspection checklist

    SQP-HV-CHK-018 · DOCX · 14 KB

View activity details
FCU Installation
  • Method statement

    SQP-HV-MS-010 · DOCX · 350 KB

  • Risk assessment

    SQP-HV-RA-010 · DOCX · 75 KB

  • Inspection and test plan

    SQP-HV-ITP-010 · DOCX · 14 KB

  • Material inspection checklist

    SQP-HV-CHK-019 · DOCX · 13 KB

  • Work inspection checklist

    SQP-HV-CHK-020 · DOCX · 14 KB

View activity details
Pumps Installation (HVAC)
  • Method statement

    SQP-HV-MS-011 · DOCX · 361 KB

  • Risk assessment

    SQP-HV-RA-011 · DOCX · 75 KB

  • Inspection and test plan

    SQP-HV-ITP-011 · DOCX · 14 KB

  • Material inspection checklist

    SQP-HV-CHK-021 · DOCX · 13 KB

  • Work inspection checklist

    SQP-HV-CHK-022 · DOCX · 14 KB

View activity details
Ventilation and Exhaust Fans
  • Method statement

    SQP-HV-MS-012 · DOCX · 365 KB

  • Risk assessment

    SQP-HV-RA-012 · DOCX · 75 KB

  • Inspection and test plan

    SQP-HV-ITP-012 · DOCX · 14 KB

  • Material inspection checklist

    SQP-HV-CHK-023 · DOCX · 13 KB

  • Work inspection checklist

    SQP-HV-CHK-024 · DOCX · 14 KB

View activity details
Grilles, Diffusers and Dampers
  • Method statement

    SQP-HV-MS-013 · DOCX · 342 KB

  • Risk assessment

    SQP-HV-RA-013 · DOCX · 75 KB

  • Inspection and test plan

    SQP-HV-ITP-013 · DOCX · 14 KB

  • Material inspection checklist

    SQP-HV-CHK-025 · DOCX · 13 KB

  • Work inspection checklist

    SQP-HV-CHK-026 · DOCX · 14 KB

View activity details
Kitchen Exhaust System
  • Method statement

    SQP-HV-MS-014 · DOCX · 361 KB

  • Risk assessment

    SQP-HV-RA-014 · DOCX · 75 KB

  • Inspection and test plan

    SQP-HV-ITP-014 · DOCX · 14 KB

  • Material inspection checklist

    SQP-HV-CHK-027 · DOCX · 13 KB

  • Work inspection checklist

    SQP-HV-CHK-028 · DOCX · 14 KB

View activity details
Flushing and Chemical Cleaning of Pipes
  • Method statement

    SQP-HV-MS-015 · DOCX · 336 KB

  • Risk assessment

    SQP-HV-RA-015 · DOCX · 76 KB

  • Inspection and test plan

    SQP-HV-ITP-015 · DOCX · 14 KB

  • Material inspection checklist

    SQP-HV-CHK-029 · DOCX · 13 KB

  • Work inspection checklist

    SQP-HV-CHK-030 · DOCX · 14 KB

View activity details
Testing, Adjusting and Balancing (TAB)
  • Method statement

    SQP-HV-MS-016 · DOCX · 297 KB

  • Risk assessment

    SQP-HV-RA-016 · DOCX · 75 KB

  • Inspection and test plan

    SQP-HV-ITP-016 · DOCX · 14 KB

  • Material inspection checklist

    SQP-HV-CHK-031 · DOCX · 13 KB

  • Work inspection checklist

    SQP-HV-CHK-032 · DOCX · 14 KB

View activity details

Plumbing & Drainage

Water Supply Piping (PPR / Copper / GI)
  • Method statement

    SQP-PD-MS-001 · DOCX · 347 KB

  • Risk assessment

    SQP-PD-RA-001 · DOCX · 75 KB

  • Inspection and test plan

    SQP-PD-ITP-001 · DOCX · 14 KB

  • Material inspection checklist

    SQP-PD-CHK-001 · DOCX · 13 KB

  • Work inspection checklist

    SQP-PD-CHK-002 · DOCX · 14 KB

View activity details
Drainage and Soil Piping (uPVC / HDPE / Cast Iron)
  • Method statement

    SQP-PD-MS-002 · DOCX · 368 KB

  • Risk assessment

    SQP-PD-RA-002 · DOCX · 75 KB

  • Inspection and test plan

    SQP-PD-ITP-002 · DOCX · 14 KB

  • Material inspection checklist

    SQP-PD-CHK-003 · DOCX · 13 KB

  • Work inspection checklist

    SQP-PD-CHK-004 · DOCX · 14 KB

View activity details
Storm Water Drainage
  • Method statement

    SQP-PD-MS-003 · DOCX · 350 KB

  • Risk assessment

    SQP-PD-RA-003 · DOCX · 75 KB

  • Inspection and test plan

    SQP-PD-ITP-003 · DOCX · 14 KB

  • Material inspection checklist

    SQP-PD-CHK-005 · DOCX · 13 KB

  • Work inspection checklist

    SQP-PD-CHK-006 · DOCX · 14 KB

View activity details
Underground Drainage and Manholes
  • Method statement

    SQP-PD-MS-004 · DOCX · 375 KB

  • Risk assessment

    SQP-PD-RA-004 · DOCX · 76 KB

  • Inspection and test plan

    SQP-PD-ITP-004 · DOCX · 14 KB

  • Material inspection checklist

    SQP-PD-CHK-007 · DOCX · 13 KB

  • Work inspection checklist

    SQP-PD-CHK-008 · DOCX · 14 KB

View activity details
Water Pumps and Booster Sets
  • Method statement

    SQP-PD-MS-005 · DOCX · 334 KB

  • Risk assessment

    SQP-PD-RA-005 · DOCX · 75 KB

  • Inspection and test plan

    SQP-PD-ITP-005 · DOCX · 14 KB

  • Material inspection checklist

    SQP-PD-CHK-009 · DOCX · 13 KB

  • Work inspection checklist

    SQP-PD-CHK-010 · DOCX · 14 KB

View activity details
Water Tanks (GRP / Steel) Installation
  • Method statement

    SQP-PD-MS-006 · DOCX · 342 KB

  • Risk assessment

    SQP-PD-RA-006 · DOCX · 76 KB

  • Inspection and test plan

    SQP-PD-ITP-006 · DOCX · 14 KB

  • Material inspection checklist

    SQP-PD-CHK-011 · DOCX · 13 KB

  • Work inspection checklist

    SQP-PD-CHK-012 · DOCX · 14 KB

View activity details
Water Heaters Installation
  • Method statement

    SQP-PD-MS-007 · DOCX · 348 KB

  • Risk assessment

    SQP-PD-RA-007 · DOCX · 75 KB

  • Inspection and test plan

    SQP-PD-ITP-007 · DOCX · 14 KB

  • Material inspection checklist

    SQP-PD-CHK-013 · DOCX · 13 KB

  • Work inspection checklist

    SQP-PD-CHK-014 · DOCX · 14 KB

View activity details
Grease Traps and Interceptors
  • Method statement

    SQP-PD-MS-008 · DOCX · 344 KB

  • Risk assessment

    SQP-PD-RA-008 · DOCX · 76 KB

  • Inspection and test plan

    SQP-PD-ITP-008 · DOCX · 14 KB

  • Material inspection checklist

    SQP-PD-CHK-015 · DOCX · 13 KB

  • Work inspection checklist

    SQP-PD-CHK-016 · DOCX · 14 KB

View activity details
Pressure Testing of Water Piping
  • Method statement

    SQP-PD-MS-009 · DOCX · 319 KB

  • Risk assessment

    SQP-PD-RA-009 · DOCX · 76 KB

  • Inspection and test plan

    SQP-PD-ITP-009 · DOCX · 14 KB

  • Material inspection checklist

    SQP-PD-CHK-017 · DOCX · 13 KB

  • Work inspection checklist

    SQP-PD-CHK-018 · DOCX · 14 KB

View activity details
Drainage Water Test / Flow Test
  • Method statement

    SQP-PD-MS-010 · DOCX · 302 KB

  • Risk assessment

    SQP-PD-RA-010 · DOCX · 75 KB

  • Inspection and test plan

    SQP-PD-ITP-010 · DOCX · 14 KB

  • Material inspection checklist

    SQP-PD-CHK-019 · DOCX · 13 KB

  • Work inspection checklist

    SQP-PD-CHK-020 · DOCX · 14 KB

View activity details
Disinfection and Flushing of Water System
  • Method statement

    SQP-PD-MS-011 · DOCX · 309 KB

  • Risk assessment

    SQP-PD-RA-011 · DOCX · 75 KB

  • Inspection and test plan

    SQP-PD-ITP-011 · DOCX · 14 KB

  • Material inspection checklist

    SQP-PD-CHK-021 · DOCX · 13 KB

  • Work inspection checklist

    SQP-PD-CHK-022 · DOCX · 14 KB

View activity details

Fire Protection & Life Safety

Sprinkler System Installation
  • Method statement

    SQP-FP-MS-001 · DOCX · 358 KB

  • Risk assessment

    SQP-FP-RA-001 · DOCX · 76 KB

  • Inspection and test plan

    SQP-FP-ITP-001 · DOCX · 14 KB

  • Material inspection checklist

    SQP-FP-CHK-001 · DOCX · 13 KB

  • Work inspection checklist

    SQP-FP-CHK-002 · DOCX · 14 KB

View activity details
Fire Pumps Installation
  • Method statement

    SQP-FP-MS-002 · DOCX · 368 KB

  • Risk assessment

    SQP-FP-RA-002 · DOCX · 76 KB

  • Inspection and test plan

    SQP-FP-ITP-002 · DOCX · 14 KB

  • Material inspection checklist

    SQP-FP-CHK-003 · DOCX · 13 KB

  • Work inspection checklist

    SQP-FP-CHK-004 · DOCX · 14 KB

View activity details
Fire Hydrant and Hose Reel System
  • Method statement

    SQP-FP-MS-003 · DOCX · 339 KB

  • Risk assessment

    SQP-FP-RA-003 · DOCX · 76 KB

  • Inspection and test plan

    SQP-FP-ITP-003 · DOCX · 14 KB

  • Material inspection checklist

    SQP-FP-CHK-005 · DOCX · 13 KB

  • Work inspection checklist

    SQP-FP-CHK-006 · DOCX · 14 KB

View activity details
Wet / Dry Riser System
  • Method statement

    SQP-FP-MS-004 · DOCX · 325 KB

  • Risk assessment

    SQP-FP-RA-004 · DOCX · 76 KB

  • Inspection and test plan

    SQP-FP-ITP-004 · DOCX · 14 KB

  • Material inspection checklist

    SQP-FP-CHK-007 · DOCX · 13 KB

  • Work inspection checklist

    SQP-FP-CHK-008 · DOCX · 14 KB

View activity details
FM200 / Clean Agent System
  • Method statement

    SQP-FP-MS-005 · DOCX · 349 KB

  • Risk assessment

    SQP-FP-RA-005 · DOCX · 76 KB

  • Inspection and test plan

    SQP-FP-ITP-005 · DOCX · 14 KB

  • Material inspection checklist

    SQP-FP-CHK-009 · DOCX · 13 KB

  • Work inspection checklist

    SQP-FP-CHK-010 · DOCX · 14 KB

View activity details
Fire Alarm System Installation
  • Method statement

    SQP-FP-MS-006 · DOCX · 318 KB

  • Risk assessment

    SQP-FP-RA-006 · DOCX · 75 KB

  • Inspection and test plan

    SQP-FP-ITP-006 · DOCX · 14 KB

  • Material inspection checklist

    SQP-FP-CHK-011 · DOCX · 13 KB

  • Work inspection checklist

    SQP-FP-CHK-012 · DOCX · 14 KB

View activity details
Smoke Management / Pressurisation System
  • Method statement

    SQP-FP-MS-007 · DOCX · 324 KB

  • Risk assessment

    SQP-FP-RA-007 · DOCX · 76 KB

  • Inspection and test plan

    SQP-FP-ITP-007 · DOCX · 14 KB

  • Material inspection checklist

    SQP-FP-CHK-013 · DOCX · 13 KB

  • Work inspection checklist

    SQP-FP-CHK-014 · DOCX · 14 KB

View activity details
Fire Extinguishers Installation
  • Method statement

    SQP-FP-MS-008 · DOCX · 308 KB

  • Risk assessment

    SQP-FP-RA-008 · DOCX · 75 KB

  • Inspection and test plan

    SQP-FP-ITP-008 · DOCX · 14 KB

  • Material inspection checklist

    SQP-FP-CHK-015 · DOCX · 13 KB

  • Work inspection checklist

    SQP-FP-CHK-016 · DOCX · 14 KB

View activity details
Fire Protection System Testing and Commissioning
  • Method statement

    SQP-FP-MS-009 · DOCX · 320 KB

  • Risk assessment

    SQP-FP-RA-009 · DOCX · 76 KB

  • Inspection and test plan

    SQP-FP-ITP-009 · DOCX · 14 KB

  • Material inspection checklist

    SQP-FP-CHK-017 · DOCX · 13 KB

  • Work inspection checklist

    SQP-FP-CHK-018 · DOCX · 14 KB

View activity details

Electrical

Cable Trays and Trunking Installation
  • Method statement

    SQP-EL-MS-001 · DOCX · 347 KB

  • Risk assessment

    SQP-EL-RA-001 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EL-ITP-001 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EL-CHK-001 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EL-CHK-002 · DOCX · 14 KB

View activity details
Conduit Installation (Concealed / Exposed)
  • Method statement

    SQP-EL-MS-002 · DOCX · 342 KB

  • Risk assessment

    SQP-EL-RA-002 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EL-ITP-002 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EL-CHK-003 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EL-CHK-004 · DOCX · 14 KB

View activity details
LV Cable Pulling and Termination
  • Method statement

    SQP-EL-MS-003 · DOCX · 343 KB

  • Risk assessment

    SQP-EL-RA-003 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EL-ITP-003 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EL-CHK-005 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EL-CHK-006 · DOCX · 14 KB

View activity details
MV Cable Installation and Testing
  • Method statement

    SQP-EL-MS-004 · DOCX · 353 KB

  • Risk assessment

    SQP-EL-RA-004 · DOCX · 76 KB

  • Inspection and test plan

    SQP-EL-ITP-004 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EL-CHK-007 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EL-CHK-008 · DOCX · 14 KB

View activity details
Busduct Installation
  • Method statement

    SQP-EL-MS-005 · DOCX · 331 KB

  • Risk assessment

    SQP-EL-RA-005 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EL-ITP-005 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EL-CHK-009 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EL-CHK-010 · DOCX · 14 KB

View activity details
Transformers Installation
  • Method statement

    SQP-EL-MS-006 · DOCX · 346 KB

  • Risk assessment

    SQP-EL-RA-006 · DOCX · 76 KB

  • Inspection and test plan

    SQP-EL-ITP-006 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EL-CHK-011 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EL-CHK-012 · DOCX · 14 KB

View activity details
MV / LV Switchgear and Panels Installation
  • Method statement

    SQP-EL-MS-007 · DOCX · 343 KB

  • Risk assessment

    SQP-EL-RA-007 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EL-ITP-007 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EL-CHK-013 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EL-CHK-014 · DOCX · 14 KB

View activity details
Distribution Boards Installation
  • Method statement

    SQP-EL-MS-008 · DOCX · 310 KB

  • Risk assessment

    SQP-EL-RA-008 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EL-ITP-008 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EL-CHK-015 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EL-CHK-016 · DOCX · 14 KB

View activity details
Diesel Generator Installation
  • Method statement

    SQP-EL-MS-009 · DOCX · 357 KB

  • Risk assessment

    SQP-EL-RA-009 · DOCX · 76 KB

  • Inspection and test plan

    SQP-EL-ITP-009 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EL-CHK-017 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EL-CHK-018 · DOCX · 14 KB

View activity details
UPS and Batteries Installation
  • Method statement

    SQP-EL-MS-010 · DOCX · 344 KB

  • Risk assessment

    SQP-EL-RA-010 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EL-ITP-010 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EL-CHK-019 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EL-CHK-020 · DOCX · 14 KB

View activity details
Lighting Fixtures Installation
  • Method statement

    SQP-EL-MS-011 · DOCX · 337 KB

  • Risk assessment

    SQP-EL-RA-011 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EL-ITP-011 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EL-CHK-021 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EL-CHK-022 · DOCX · 14 KB

View activity details
Wiring Devices (Sockets and Switches)
  • Method statement

    SQP-EL-MS-012 · DOCX · 310 KB

  • Risk assessment

    SQP-EL-RA-012 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EL-ITP-012 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EL-CHK-023 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EL-CHK-024 · DOCX · 14 KB

View activity details
Earthing and Bonding System
  • Method statement

    SQP-EL-MS-013 · DOCX · 350 KB

  • Risk assessment

    SQP-EL-RA-013 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EL-ITP-013 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EL-CHK-025 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EL-CHK-026 · DOCX · 14 KB

View activity details
Lightning Protection System
  • Method statement

    SQP-EL-MS-014 · DOCX · 347 KB

  • Risk assessment

    SQP-EL-RA-014 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EL-ITP-014 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EL-CHK-027 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EL-CHK-028 · DOCX · 14 KB

View activity details
Emergency Lighting System
  • Method statement

    SQP-EL-MS-015 · DOCX · 342 KB

  • Risk assessment

    SQP-EL-RA-015 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EL-ITP-015 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EL-CHK-029 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EL-CHK-030 · DOCX · 14 KB

View activity details
Insulation Resistance (Megger) Testing
  • Method statement

    SQP-EL-MS-016 · DOCX · 313 KB

  • Risk assessment

    SQP-EL-RA-016 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EL-ITP-016 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EL-CHK-031 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EL-CHK-032 · DOCX · 14 KB

View activity details
Electrical Testing and Commissioning
  • Method statement

    SQP-EL-MS-017 · DOCX · 324 KB

  • Risk assessment

    SQP-EL-RA-017 · DOCX · 76 KB

  • Inspection and test plan

    SQP-EL-ITP-017 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EL-CHK-033 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EL-CHK-034 · DOCX · 14 KB

View activity details

ELV & BMS

CCTV System
  • Method statement

    SQP-EV-MS-001 · DOCX · 325 KB

  • Risk assessment

    SQP-EV-RA-001 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EV-ITP-001 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EV-CHK-001 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EV-CHK-002 · DOCX · 14 KB

View activity details
Access Control System
  • Method statement

    SQP-EV-MS-002 · DOCX · 324 KB

  • Risk assessment

    SQP-EV-RA-002 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EV-ITP-002 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EV-CHK-003 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EV-CHK-004 · DOCX · 14 KB

View activity details
Structured Cabling (Data and Voice)
  • Method statement

    SQP-EV-MS-003 · DOCX · 322 KB

  • Risk assessment

    SQP-EV-RA-003 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EV-ITP-003 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EV-CHK-005 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EV-CHK-006 · DOCX · 14 KB

View activity details
Public Address / Voice Evacuation System
  • Method statement

    SQP-EV-MS-004 · DOCX · 338 KB

  • Risk assessment

    SQP-EV-RA-004 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EV-ITP-004 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EV-CHK-007 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EV-CHK-008 · DOCX · 14 KB

View activity details
Master Antenna / IPTV System
  • Method statement

    SQP-EV-MS-005 · DOCX · 274 KB

  • Risk assessment

    SQP-EV-RA-005 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EV-ITP-005 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EV-CHK-009 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EV-CHK-010 · DOCX · 14 KB

View activity details
Intercom System
  • Method statement

    SQP-EV-MS-006 · DOCX · 274 KB

  • Risk assessment

    SQP-EV-RA-006 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EV-ITP-006 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EV-CHK-011 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EV-CHK-012 · DOCX · 14 KB

View activity details
Building Management System (BMS)
  • Method statement

    SQP-EV-MS-007 · DOCX · 283 KB

  • Risk assessment

    SQP-EV-RA-007 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EV-ITP-007 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EV-CHK-013 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EV-CHK-014 · DOCX · 14 KB

View activity details
ELV Systems Testing and Commissioning
  • Method statement

    SQP-EV-MS-008 · DOCX · 327 KB

  • Risk assessment

    SQP-EV-RA-008 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EV-ITP-008 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EV-CHK-015 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EV-CHK-016 · DOCX · 14 KB

View activity details

Vertical Transportation

Lift Installation
  • Method statement

    SQP-VT-MS-001 · DOCX · 308 KB

  • Risk assessment

    SQP-VT-RA-001 · DOCX · 76 KB

  • Inspection and test plan

    SQP-VT-ITP-001 · DOCX · 14 KB

  • Material inspection checklist

    SQP-VT-CHK-001 · DOCX · 13 KB

  • Work inspection checklist

    SQP-VT-CHK-002 · DOCX · 14 KB

View activity details
Escalator / Travelator Installation
  • Method statement

    SQP-VT-MS-002 · DOCX · 350 KB

  • Risk assessment

    SQP-VT-RA-002 · DOCX · 76 KB

  • Inspection and test plan

    SQP-VT-ITP-002 · DOCX · 14 KB

  • Material inspection checklist

    SQP-VT-CHK-003 · DOCX · 13 KB

  • Work inspection checklist

    SQP-VT-CHK-004 · DOCX · 14 KB

View activity details
Lift Shaft Preparation and Survey
  • Method statement

    SQP-VT-MS-003 · DOCX · 320 KB

  • Risk assessment

    SQP-VT-RA-003 · DOCX · 76 KB

  • Inspection and test plan

    SQP-VT-ITP-003 · DOCX · 14 KB

  • Material inspection checklist

    SQP-VT-CHK-005 · DOCX · 13 KB

  • Work inspection checklist

    SQP-VT-CHK-006 · DOCX · 14 KB

View activity details
Lift Testing and Commissioning
  • Method statement

    SQP-VT-MS-004 · DOCX · 330 KB

  • Risk assessment

    SQP-VT-RA-004 · DOCX · 75 KB

  • Inspection and test plan

    SQP-VT-ITP-004 · DOCX · 14 KB

  • Material inspection checklist

    SQP-VT-CHK-007 · DOCX · 13 KB

  • Work inspection checklist

    SQP-VT-CHK-008 · DOCX · 14 KB

View activity details

External Works & Infrastructure

Road Works (Sub-base / Base / Asphalt)
  • Method statement

    SQP-EX-MS-001 · DOCX · 331 KB

  • Risk assessment

    SQP-EX-RA-001 · DOCX · 76 KB

  • Inspection and test plan

    SQP-EX-ITP-001 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EX-CHK-001 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EX-CHK-002 · DOCX · 14 KB

View activity details
Interlock Paving
  • Method statement

    SQP-EX-MS-002 · DOCX · 314 KB

  • Risk assessment

    SQP-EX-RA-002 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EX-ITP-002 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EX-CHK-003 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EX-CHK-004 · DOCX · 14 KB

View activity details
Kerbstones Installation
  • Method statement

    SQP-EX-MS-003 · DOCX · 349 KB

  • Risk assessment

    SQP-EX-RA-003 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EX-ITP-003 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EX-CHK-005 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EX-CHK-006 · DOCX · 14 KB

View activity details
Landscaping and Planting
  • Method statement

    SQP-EX-MS-004 · DOCX · 332 KB

  • Risk assessment

    SQP-EX-RA-004 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EX-ITP-004 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EX-CHK-007 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EX-CHK-008 · DOCX · 14 KB

View activity details
Irrigation System
  • Method statement

    SQP-EX-MS-005 · DOCX · 313 KB

  • Risk assessment

    SQP-EX-RA-005 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EX-ITP-005 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EX-CHK-009 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EX-CHK-010 · DOCX · 14 KB

View activity details
External Lighting
  • Method statement

    SQP-EX-MS-006 · DOCX · 338 KB

  • Risk assessment

    SQP-EX-RA-006 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EX-ITP-006 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EX-CHK-011 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EX-CHK-012 · DOCX · 14 KB

View activity details
Boundary Wall and Gates
  • Method statement

    SQP-EX-MS-007 · DOCX · 360 KB

  • Risk assessment

    SQP-EX-RA-007 · DOCX · 75 KB

  • Inspection and test plan

    SQP-EX-ITP-007 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EX-CHK-013 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EX-CHK-014 · DOCX · 14 KB

View activity details
Utility Connections (Water / Sewer / Power / Telecom)
  • Method statement

    SQP-EX-MS-008 · DOCX · 348 KB

  • Risk assessment

    SQP-EX-RA-008 · DOCX · 76 KB

  • Inspection and test plan

    SQP-EX-ITP-008 · DOCX · 14 KB

  • Material inspection checklist

    SQP-EX-CHK-015 · DOCX · 13 KB

  • Work inspection checklist

    SQP-EX-CHK-016 · DOCX · 14 KB

View activity details