ACT-162 / ITP / R00
External Lighting — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release bases and ducts | — | — | — | — | — |
| Install using approved lifting method | — | — | — | — | — |
| Aim and verify controls | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: lighting poles, bases, conduits and earthing
Inspection sequence
- Release bases and ducts
- Install using approved lifting method
- Aim and verify controls
Inspection controls
- Plumb, bonding, electrical tests and illumination
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________