ACT-162 / CHK / R00
External Lighting — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release bases and ducts | — | — | — | — | — |
| Install using approved lifting method | — | — | — | — | — |
| Aim and verify controls | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: lighting poles, bases, conduits and earthing
Inspection points
- Release bases and ducts
- Install using approved lifting method
- Aim and verify controls
Records and release
- Plumb, bonding, electrical tests and illumination
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________