ACT-161 / RA / R00
Irrigation System — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Coordinate sleeves and zones | — | — | — | — | — |
| Flush before installing emitters | — | — | — | — | — |
| Check coverage | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: irrigation mains, laterals, valves and emitters
Task risk review
- Coordinate sleeves and zones
- Flush before installing emitters
- Check coverage
Assessment prompts
- Assess interfaces relevant to this location: Underground utilities, public access and mobile plant.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________