Skip to content

Risk AssessmentACT-161-RAR00Available

Irrigation System — Risk Assessment

Irrigation SystemInfrastructure

ACT-161 / RA / R00

Irrigation System — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Coordinate sleeves and zones—————
Flush before installing emitters—————
Check coverage—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: irrigation mains, laterals, valves and emitters

Task risk review

  • Coordinate sleeves and zones
  • Flush before installing emitters
  • Check coverage

Assessment prompts

  • Assess interfaces relevant to this location: Underground utilities, public access and mobile plant.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

3