ACT-161 / ITP / R00
Irrigation System — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Coordinate sleeves and zones | — | — | — | — | — |
| Flush before installing emitters | — | — | — | — | — |
| Check coverage | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: irrigation mains, laterals, valves and emitters
Inspection sequence
- Coordinate sleeves and zones
- Flush before installing emitters
- Check coverage
Inspection controls
- Zone pressure, coverage, controller settings and routing
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________