Kerbstones Installation — Risk Assessment

Kerbstones InstallationInfrastructure

ACT-159 / RA / R00

Kerbstones Installation — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Set line and radii—————
Form crossings and drainage transitions—————
Lay and protect—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: kerbs, bedding, haunching and levels

Task risk review

  • Set line and radii
  • Form crossings and drainage transitions
  • Lay and protect

Assessment prompts

  • Assess interfaces relevant to this location: Underground utilities, public access and mobile plant.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.