ACT-159 / CHK / R00
Kerbstones Installation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Set line and radii | — | — | — | — | — |
| Form crossings and drainage transitions | — | — | — | — | — |
| Lay and protect | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: kerbs, bedding, haunching and levels
Inspection points
- Set line and radii
- Form crossings and drainage transitions
- Lay and protect
Records and release
- Alignment, levels and backing
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________