ACT-149 / ITP / R00
Master Antenna / IPTV System — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Confirm topology | — | — | — | — | — |
| Install and label equipment | — | — | — | — | — |
| Verify endpoint operation | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: headend, splitters, network links and outlets
Inspection sequence
- Confirm topology
- Install and label equipment
- Verify endpoint operation
Inspection controls
- Signal or stream quality, channel list and network acceptance
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________