ACT-149 / CHK / R00
Master Antenna / IPTV System — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Confirm topology | — | — | — | — | — |
| Install and label equipment | — | — | — | — | — |
| Verify endpoint operation | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: headend, splitters, network links and outlets
Inspection points
- Confirm topology
- Install and label equipment
- Verify endpoint operation
Records and release
- Signal or stream quality, channel list and network acceptance
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________