ACT-148 / ITP / R00
Public Address / Voice Evacuation System — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Verify zones and alarm interface | — | — | — | — | — |
| Install equipment | — | — | — | — | — |
| Witness message priority | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: speakers, amplifiers, supervised circuits and instruments
Inspection sequence
- Verify zones and alarm interface
- Install equipment
- Witness message priority
Inspection controls
- Intelligibility, fault supervision and zone boundaries
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________