ACT-148 / CHK / R00
Public Address / Voice Evacuation System — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Verify zones and alarm interface | — | — | — | — | — |
| Install equipment | — | — | — | — | — |
| Witness message priority | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: speakers, amplifiers, supervised circuits and instruments
Inspection points
- Verify zones and alarm interface
- Install equipment
- Witness message priority
Records and release
- Intelligibility, fault supervision and zone boundaries
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________