Skip to content

Risk AssessmentACT-142-RAR00Available

Emergency Lighting System — Risk Assessment

Emergency Lighting SystemElectrical

ACT-142 / RA / R00

Emergency Lighting System — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Confirm egress plan—————
Install labelled fixtures—————
Verify normal and emergency changeover—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: emergency lights, batteries and controls

Task risk review

  • Confirm egress plan
  • Install labelled fixtures
  • Verify normal and emergency changeover

Assessment prompts

  • Assess interfaces relevant to this location: Electrical energy, inadvertent operation and access control.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

3