Inspection and Test PlanACT-142-ITPR00Available

Emergency Lighting System — Inspection and Test Plan

Emergency Lighting SystemElectrical

ACT-142 / ITP / R00

Emergency Lighting System — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Confirm egress plan—————
Install labelled fixtures—————
Verify normal and emergency changeover—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: emergency lights, batteries and controls

Inspection sequence

  • Confirm egress plan
  • Install labelled fixtures
  • Verify normal and emergency changeover

Inspection controls

  • Locations, duration, illumination and escape coverage
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________