ACT-142 / ITP / R00
Emergency Lighting System — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Confirm egress plan | — | — | — | — | — |
| Install labelled fixtures | — | — | — | — | — |
| Verify normal and emergency changeover | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: emergency lights, batteries and controls
Inspection sequence
- Confirm egress plan
- Install labelled fixtures
- Verify normal and emergency changeover
Inspection controls
- Locations, duration, illumination and escape coverage
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________