ACT-139 / RA / R00
Wiring Devices (Sockets and Switches) — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Verify ratings and locations | — | — | — | — | — |
| Terminate isolated circuits | — | — | — | — | — |
| Align and test devices | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: sockets, switches, enclosures and tester
Task risk review
- Verify ratings and locations
- Terminate isolated circuits
- Align and test devices
Assessment prompts
- Assess interfaces relevant to this location: Electrical energy, inadvertent operation and access control.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________