| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Verify ratings and locations | — | — | — | — | — |
| Terminate isolated circuits | — | — | — | — | — |
| Align and test devices | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: sockets, switches, enclosures and tester
Inspection sequence
- Verify ratings and locations
- Terminate isolated circuits
- Align and test devices
Inspection controls
- Polarity, protection, labels and accessibility
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.