Lighting Fixtures Installation — Risk Assessment

Lighting Fixtures InstallationElectrical

ACT-138 / RA / R00

Lighting Fixtures Installation — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Coordinate fixtures and ceiling—————
Mount and aim fittings—————
Verify controls—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: luminaires, drivers, supports and controls

Task risk review

  • Coordinate fixtures and ceiling
  • Mount and aim fittings
  • Verify controls

Assessment prompts

  • Assess interfaces relevant to this location: Electrical energy, inadvertent operation and access control.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________