ACT-138 / ITP / R00
Lighting Fixtures Installation — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Coordinate fixtures and ceiling | — | — | — | — | — |
| Mount and aim fittings | — | — | — | — | — |
| Verify controls | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: luminaires, drivers, supports and controls
Inspection sequence
- Coordinate fixtures and ceiling
- Mount and aim fittings
- Verify controls
Inspection controls
- Circuit IDs, switching and light readings where required
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________