ACT-133 / ITP / R00
Transformers Installation — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release pad and ventilation | — | — | — | — | — |
| Position unit | — | — | — | — | — |
| Connect under authorised specialist procedure | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: transformer, mounts and cable interfaces
Inspection sequence
- Release pad and ventilation
- Position unit
- Connect under authorised specialist procedure
Inspection controls
- Nameplate, earthing, protection and pre-service certificates
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________