ACT-133 / CHK / R00
Transformers Installation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release pad and ventilation | — | — | — | — | — |
| Position unit | — | — | — | — | — |
| Connect under authorised specialist procedure | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: transformer, mounts and cable interfaces
Inspection points
- Release pad and ventilation
- Position unit
- Connect under authorised specialist procedure
Records and release
- Nameplate, earthing, protection and pre-service certificates
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________