Skip to content

Risk AssessmentACT-127-RAR00Available

Fire Protection System Testing and Commissioning — Risk Assessment

Fire Protection System Testing and CommissioningFirefighting

ACT-127 / RA / R00

Fire Protection System Testing and Commissioning — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Confirm authority witnesses and readiness—————
Conduct authorised scenarios—————
Verify system restoration—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: flow and pressure instruments, scripts and communications

Task risk review

  • Confirm authority witnesses and readiness
  • Conduct authorised scenarios
  • Verify system restoration

Assessment prompts

  • Assess interfaces relevant to this location: System impairment, stored energy and occupied-area interfaces.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.