Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection Checklist worksheet
Inspection pointAcceptance referenceObservationPass / Fail / N/AEvidenceInspector / date
Confirm authority witnesses and readiness—————
Conduct authorised scenarios—————
Verify system restoration—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: flow and pressure instruments, scripts and communications

Inspection points

  • Confirm authority witnesses and readiness
  • Conduct authorised scenarios
  • Verify system restoration

Records and release

  • Waterflow, alarm response, pressure readings and reinstatement
  • Record observed condition, acceptance reference, result and evidence for each item.
  • Inspector / witness / date / corrective action and reinspection: ____________________