ACT-125 / ITP / R00
Smoke Management / Pressurisation System — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Confirm fire strategy | — | — | — | — | — |
| Check control paths | — | — | — | — | — |
| Witness scenarios under specified door conditions | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: smoke fans, dampers, sensors and controls
Inspection sequence
- Confirm fire strategy
- Check control paths
- Witness scenarios under specified door conditions
Inspection controls
- Fan and damper states, differential pressure and witness evidence
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________