ACT-125 / CHK / R00
Smoke Management / Pressurisation System — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Confirm fire strategy | — | — | — | — | — |
| Check control paths | — | — | — | — | — |
| Witness scenarios under specified door conditions | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: smoke fans, dampers, sensors and controls
Inspection points
- Confirm fire strategy
- Check control paths
- Witness scenarios under specified door conditions
Records and release
- Fan and damper states, differential pressure and witness evidence
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________