Wet / Dry Riser System — Inspection and Test Plan

Wet / Dry Riser SystemFirefighting

ACT-122 / ITP / R00

Wet / Dry Riser System — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Coordinate shaft crossings—————
Install vertical supports—————
Verify access and witness testing—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: riser pipes, landing valves, inlets and drains

Inspection sequence

  • Coordinate shaft crossings
  • Install vertical supports
  • Verify access and witness testing

Inspection controls

  • Floor labels, valve orientation and pressure test
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________