ACT-122 / ITP / R00
Wet / Dry Riser System — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Coordinate shaft crossings | — | — | — | — | — |
| Install vertical supports | — | — | — | — | — |
| Verify access and witness testing | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: riser pipes, landing valves, inlets and drains
Inspection sequence
- Coordinate shaft crossings
- Install vertical supports
- Verify access and witness testing
Inspection controls
- Floor labels, valve orientation and pressure test
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________