ACT-122 / CHK / R00
Wet / Dry Riser System — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Coordinate shaft crossings | — | — | — | — | — |
| Install vertical supports | — | — | — | — | — |
| Verify access and witness testing | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: riser pipes, landing valves, inlets and drains
Inspection points
- Coordinate shaft crossings
- Install vertical supports
- Verify access and witness testing
Records and release
- Floor labels, valve orientation and pressure test
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________