ACT-120 / CHK / R00
Fire Pumps Installation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release foundation and access | — | — | — | — | — |
| Coordinate suction and discharge | — | — | — | — | — |
| Witness authorised tests | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: fire pumps, listed controllers and test header
Inspection points
- Release foundation and access
- Coordinate suction and discharge
- Witness authorised tests
Records and release
- Duty results, controller sequence and certificates
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________