Inspection and Test PlanACT-119-ITPR00Available

Sprinkler System Installation — Inspection and Test Plan

Sprinkler System InstallationFirefighting

ACT-119 / ITP / R00

Sprinkler System Installation — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Coordinate obstructions and zoning—————
Install assemblies and supports—————
Obtain test release—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: sprinkler heads, pipe, valves and hangers

Inspection sequence

  • Coordinate obstructions and zoning
  • Install assemblies and supports
  • Obtain test release

Inspection controls

  • Head types and positions, support and pressure or flow evidence
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.