ACT-119 / ITP / R00
Sprinkler System Installation — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Coordinate obstructions and zoning | — | — | — | — | — |
| Install assemblies and supports | — | — | — | — | — |
| Obtain test release | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: sprinkler heads, pipe, valves and hangers
Inspection sequence
- Coordinate obstructions and zoning
- Install assemblies and supports
- Obtain test release
Inspection controls
- Head types and positions, support and pressure or flow evidence
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________