ACT-119 / CHK / R00
Sprinkler System Installation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Coordinate obstructions and zoning | — | — | — | — | — |
| Install assemblies and supports | — | — | — | — | — |
| Obtain test release | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: sprinkler heads, pipe, valves and hangers
Inspection points
- Coordinate obstructions and zoning
- Install assemblies and supports
- Obtain test release
Records and release
- Head types and positions, support and pressure or flow evidence
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________