Disinfection and Flushing of Water System — Inspection and Test Plan

Disinfection and Flushing of Water SystemPlumbing

ACT-118 / ITP / R00

Disinfection and Flushing of Water System — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Verify clean system and test release—————
Coordinate treatment and flush—————
Obtain lab clearance—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: approved disinfectant, meters and sampling kits

Inspection sequence

  • Verify clean system and test release
  • Coordinate treatment and flush
  • Obtain lab clearance

Inspection controls

  • Treatment record, sample ID, analytical results and service release
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.