ACT-118 / CHK / R00
Disinfection and Flushing of Water System — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Verify clean system and test release | — | — | — | — | — |
| Coordinate treatment and flush | — | — | — | — | — |
| Obtain lab clearance | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: approved disinfectant, meters and sampling kits
Inspection points
- Verify clean system and test release
- Coordinate treatment and flush
- Obtain lab clearance
Records and release
- Treatment record, sample ID, analytical results and service release
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________