ACT-117 / ITP / R00
Drainage Water Test / Flow Test — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Define test section | — | — | — | — | — |
| Verify containment | — | — | — | — | — |
| Witness approved filling or discharge | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: approved plugs, water supply and level instruments
Inspection sequence
- Define test section
- Verify containment
- Witness approved filling or discharge
Inspection controls
- Water head or flow, leakage, drain time and retest
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________