Skip to content

Risk AssessmentACT-114-RAR00Available

Water Heaters Installation — Risk Assessment

Water Heaters InstallationPlumbing

ACT-114 / RA / R00

Water Heaters Installation — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Confirm wall or plinth support—————
Route relief discharge—————
Obtain utilities release—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: heater, brackets, relief fittings and tray

Task risk review

  • Confirm wall or plinth support
  • Route relief discharge
  • Obtain utilities release

Assessment prompts

  • Assess interfaces relevant to this location: Stored pressure, contamination and access to pipework.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

3