ACT-114 / CHK / R00
Water Heaters Installation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Confirm wall or plinth support | — | — | — | — | — |
| Route relief discharge | — | — | — | — | — |
| Obtain utilities release | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: heater, brackets, relief fittings and tray
Inspection points
- Confirm wall or plinth support
- Route relief discharge
- Obtain utilities release
Records and release
- Tag, relief path, leakage and approved settings
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________