Water Heaters Installation — Inspection Checklist

Water Heaters InstallationPlumbing

ACT-114 / CHK / R00

Water Heaters Installation — Inspection Checklist

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection Checklist worksheet
Inspection pointAcceptance referenceObservationPass / Fail / N/AEvidenceInspector / date
Confirm wall or plinth support—————
Route relief discharge—————
Obtain utilities release—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: heater, brackets, relief fittings and tray

Inspection points

  • Confirm wall or plinth support
  • Route relief discharge
  • Obtain utilities release

Records and release

  • Tag, relief path, leakage and approved settings
  • Record observed condition, acceptance reference, result and evidence for each item.
  • Inspector / witness / date / corrective action and reinspection: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.