ACT-113 / ITP / R00
Water Tanks (GRP / Steel) Installation — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release base | — | — | — | — | — |
| Assemble under supplier procedure | — | — | — | — | — |
| Coordinate water test | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: tank panels or shell, gaskets, anchors and fittings
Inspection sequence
- Release base
- Assemble under supplier procedure
- Coordinate water test
Inspection controls
- Panel or weld checks, seals, retention and water approvals
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________