ACT-113 / CHK / R00
Water Tanks (GRP / Steel) Installation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release base | — | — | — | — | — |
| Assemble under supplier procedure | — | — | — | — | — |
| Coordinate water test | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: tank panels or shell, gaskets, anchors and fittings
Inspection points
- Release base
- Assemble under supplier procedure
- Coordinate water test
Records and release
- Panel or weld checks, seals, retention and water approvals
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________