Water Tanks (GRP / Steel) Installation — Inspection Checklist

Water Tanks (GRP / Steel) InstallationPlumbing

ACT-113 / CHK / R00

Water Tanks (GRP / Steel) Installation — Inspection Checklist

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection Checklist worksheet
Inspection pointAcceptance referenceObservationPass / Fail / N/AEvidenceInspector / date
Release base—————
Assemble under supplier procedure—————
Coordinate water test—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: tank panels or shell, gaskets, anchors and fittings

Inspection points

  • Release base
  • Assemble under supplier procedure
  • Coordinate water test

Records and release

  • Panel or weld checks, seals, retention and water approvals
  • Record observed condition, acceptance reference, result and evidence for each item.
  • Inspector / witness / date / corrective action and reinspection: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.