Water Supply Piping (PPR / Copper / GI) — Inspection and Test Plan

Water Supply Piping (PPR / Copper / GI)Plumbing

ACT-108 / ITP / R00

Water Supply Piping (PPR / Copper / GI) — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Coordinate route and isolation—————
Join approved system—————
Protect ends before testing—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: pipe, valves and supports

Inspection sequence

  • Coordinate route and isolation
  • Join approved system
  • Protect ends before testing

Inspection controls

  • Material and joint logs, pressure test and disinfection release
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.