ACT-108 / CHK / R00
Water Supply Piping (PPR / Copper / GI) — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Coordinate route and isolation | — | — | — | — | — |
| Join approved system | — | — | — | — | — |
| Protect ends before testing | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: pipe, valves and supports
Inspection points
- Coordinate route and isolation
- Join approved system
- Protect ends before testing
Records and release
- Material and joint logs, pressure test and disinfection release
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________