ACT-106 / CHK / R00
Flushing and Chemical Cleaning of Pipes — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Confirm isolation and disposal plan | — | — | — | — | — |
| Document specialist circulation | — | — | — | — | — |
| Sample designated points | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: approved chemicals, temporary hoses and sampling kits
Inspection points
- Confirm isolation and disposal plan
- Document specialist circulation
- Sample designated points
Records and release
- Chemical batch, circuit results, approved limits and effluent disposition
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________