ACT-103 / ITP / R00
Ventilation and Exhaust Fans — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Confirm orientation and duty | — | — | — | — | — |
| Mount and isolate vibration | — | — | — | — | — |
| Release electrical interfaces | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: fans, isolators, flexible connections and guards
Inspection sequence
- Confirm orientation and duty
- Mount and isolate vibration
- Release electrical interfaces
Inspection controls
- Airflow direction, rotation, guards and performance
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________