ACT-099 / ITP / R00
Cooling Towers Installation — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release supports | — | — | — | — | — |
| Assemble modules | — | — | — | — | — |
| Coordinate basin checks and start-up | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: tower modules, basin, fan and treatment interfaces
Inspection sequence
- Release supports
- Assemble modules
- Coordinate basin checks and start-up
Inspection controls
- Basin leakage, alignment, fan and treatment handover
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________