ACT-099 / CHK / R00
Cooling Towers Installation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release supports | — | — | — | — | — |
| Assemble modules | — | — | — | — | — |
| Coordinate basin checks and start-up | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: tower modules, basin, fan and treatment interfaces
Inspection points
- Release supports
- Assemble modules
- Coordinate basin checks and start-up
Records and release
- Basin leakage, alignment, fan and treatment handover
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________