Chillers Installation — Inspection and Test Plan

Chillers InstallationHVAC

ACT-098 / ITP / R00

Chillers Installation — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Release plinth and access—————
Align set—————
Coordinate manufacturer start-up—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: chiller, vibration mounts and services

Inspection sequence

  • Release plinth and access
  • Align set
  • Coordinate manufacturer start-up

Inspection controls

  • Tag, mounts, alignment and commissioning results
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.