ACT-098 / CHK / R00
Chillers Installation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release plinth and access | — | — | — | — | — |
| Align set | — | — | — | — | — |
| Coordinate manufacturer start-up | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: chiller, vibration mounts and services
Inspection points
- Release plinth and access
- Align set
- Coordinate manufacturer start-up
Records and release
- Tag, mounts, alignment and commissioning results
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________