ACT-096 / ITP / R00
Chilled Water Pipe Insulation — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release tested pipe | — | — | — | — | — |
| Insulate around valves and supports | — | — | — | — | — |
| Seal jacket penetrations | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: pipe insulation, vapour jacket and inserts
Inspection sequence
- Release tested pipe
- Insulate around valves and supports
- Seal jacket penetrations
Inspection controls
- Thickness, seams, vapour continuity and thermal breaks
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________