Chilled Water Pipe Insulation — Inspection and Test Plan

Chilled Water Pipe InsulationHVAC

ACT-096 / ITP / R00

Chilled Water Pipe Insulation — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Release tested pipe—————
Insulate around valves and supports—————
Seal jacket penetrations—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: pipe insulation, vapour jacket and inserts

Inspection sequence

  • Release tested pipe
  • Insulate around valves and supports
  • Seal jacket penetrations

Inspection controls

  • Thickness, seams, vapour continuity and thermal breaks
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.