ACT-096 / CHK / R00
Chilled Water Pipe Insulation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release tested pipe | — | — | — | — | — |
| Insulate around valves and supports | — | — | — | — | — |
| Seal jacket penetrations | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: pipe insulation, vapour jacket and inserts
Inspection points
- Release tested pipe
- Insulate around valves and supports
- Seal jacket penetrations
Records and release
- Thickness, seams, vapour continuity and thermal breaks
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________