Duct Insulation — Inspection and Test Plan

Duct InsulationHVAC

ACT-093 / ITP / R00

Duct Insulation — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Release clean tested ducts—————
Fit insulation around supports—————
Seal vapour jacket—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: approved duct insulation and vapour barrier

Inspection sequence

  • Release clean tested ducts
  • Fit insulation around supports
  • Seal vapour jacket

Inspection controls

  • Thickness, jacket continuity and access
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.